Australian commercial HDPE grease trap systemsCall Craig: 0417 129 569

Hydraulic Engineers

Specification resources for commercial trade waste projects

Product drawings, inlet heights, legacy certification history and direct technical support for consultants specifying Port Capital HDPE grease traps.

Drawingsreal product imagesComplianceAS/NZS 1546.1:2008 referenceSupportselection and documentation

Specification support

Technical information for design, tender and construction stages

  • Capacity, dimensions and inlet height references for standard products.
  • Installation and lid-loading discussion for project site conditions.
  • Legacy certification history for authority and project documentation review.
  • Direct product support for hydraulic engineers and trade waste consultants.
Port Capital grease trap cutaway diagram for engineering specification
Cutaway diagram showing inlet, chambers, baffles, FOG separation, solids settlement and outlet flow.
PD

Product drawings

Use the real supplied drawings for preliminary model review and coordination.

CO

Compliance notes

Legacy certification history and original BSI Benchmark Certificate BMP650560 are published for review.

ID

Installation data

Review excavation, backfill, pipe connections, access openings and maintenance access before documentation.

TW

Trade waste coordination

Confirm requirements with the relevant council, water authority and trade waste conditions.

DL

Technical downloads

Access brochure, specifications, legacy certification notes and product range information from the downloads library.

ES

Engineer support

Send project details to Polyrib for model selection and documentation assistance.

Specification downloads

Port Capital Technical BrochureProduct drawings, capacities, dimensions and technical notes.PDFCertification & ComplianceLegacy certificate history and AS/NZS 1546.1:2008 reference.HTML

Specification checklist

  • Confirm required capacity and proposed model.
  • Check inlet/outlet invert requirements and cover levels.
  • Confirm lid loading, access and pump-out requirements.
  • Check local authority and trade waste approval pathway.
  • Request compliance or installation support before final issue.
Call Craig